翻訳と辞書 ・ Hammersmith and Fulham London Borough Council election, 1990 ・ Hammersmith and Fulham London Borough Council election, 1994 ・ Hammersmith and Fulham London Borough Council election, 1998 ・ Hammersmith and Fulham London Borough Council election, 2006 ・ Hammersmith and Fulham London Borough Council election, 2010 ・ Hammersmith and Fulham London Borough Council election, 2014 ・ Hammersmith and Fulham London Borough Council elections ・ Hammersmith and Fulham Parks Constabulary ・ Hammersmith Apollo ・ Hammersmith Bridge ・ Hammersmith Broadway ・ Hammersmith bus station ・ Hammersmith Creek ・ Hammersmith Farm ・ Hammersmith Fire Station ・ Hammersmith flyover ・ Hammersmith Ghost murder case ・ Hammersmith Head ・ Hammersmith Hills Hoists ・ Hammersmith Hospital ・ Hammersmith Is Out ・ Hammersmith Library ・ Hammersmith London Borough Council election, 1964 ・ Hammersmith London Borough Council election, 1968 ・ Hammersmith London Borough Council election, 1971 ・ Hammersmith London Borough Council election, 1974 ・ Hammersmith London Borough Council election, 1978 ・ Hammersmith North (UK Parliament constituency) ・ Hammersmith North by-election, 1926 ・ Hammersmith North by-election, 1934
|
|
Hammersmith flyover : ウィキペディア英語版 | Hammersmith flyover
The Hammersmith flyover is an elevated roadway in west London which carries the A4 arterial road over and to one side of the central Hammersmith gyratory system, and it links together the Cromwell Road extension (Talgarth Road) with the start of the Great West Road. It is one of the first examples of an elevated road using reinforced concrete. ==Design== An elevated road employing reinforced concrete balanced cantilever beam supports with a single central column. The deck spine and wings are of hollow prestressed concrete design, with each span being tensioned by longitudinal tendons (four clusters, each of sixteen 29mm steel cables).〔(Engineering Timelines: Hammersmith Flyover )〕 The flyover was designed by G. Maunsell & Partners, Consulting Engineers, led by Peter Wroth and is 622 metres long. When built the flyover included heating cables to "eliminate ice formation". The system was initially successful, though a £4800 bill for the 1962–63 winter "so shocked Hammersmith Borough Council that, as a protest, it cut off the electricity". London County Council paid the bill after this. The heating system became defective at some point a "long time" before 2000.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Hammersmith flyover」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|